- Install the Bch 16 A contactor securely in the designated submersible panel slot
- Ensure proper electrical connections according to the panel specifications
- Regularly inspect the contactor for any signs of damage or wear
- Follow manufacturer's guidelines for maintenance and servicing to optimize performance
- Operate the submersible panel in accordance with safety regulations to ensure long-term functionality.
Keywords: Bch 16 A contactor, heavy duty, industries, panel builders, submersible panel