Install the cooling tower on a level, well-ventilated foundation as per the manufacturer’s layout. Connect inlet and outlet pipelines, electrical supply, and water make-up line. Ensure proper earthing and alignment of pumps and fans. Start the pump first, then the fan, and check water flow, drift, and vibration. Perform regular inspection, cleaning of nozzles and fills, and maintain water quality with appropriate treatment chemicals. Follow recommended service intervals for motors, gearboxes and bearings to ensure efficient and safe operation.